Clearwater provides natural gas, water, sewer, stormwater, and solid waste services to its residents. Duke Energy has provided electric service since 2012.
The city has contracted with NewGen Strategies and Solutions to study the feasibility of Clearwater distributing electricity directly to its citizens and businesses. Almost three dozen cities in Florida already provide electricity to their constituents. The most recent city in Florida to municipalize was Winter Park.
The city can operate a distribution-only utility without constructing or owning power plants or transmission lines. According to NewGen, the estimated cost of acquiring Duke Energy’s distribution infrastructure is approximately $572 million.